Orion Lagoon in Springfield which was officially opened in 2015 is the third free public swimming lagoon to be developed in Southeast Queensland, coming after lagoons at Brisbane’s South Bank (1992) and Settlement Cove in Redcliffe (1993).
Orion Lagoon is situated between Orion Springfield Central shopping mall and a large area of parklands known as Robelle Domain.
The lagoon’s total wet area is greater than 3,000m2, divided into three distinct but interconnected sections:
- The large centre section has depths ranging from zero to 1.5 metres with beach style entry and enough room to swim 50 metre laps.
- The head section is a “sculptured pool” with steps, ramps, and a maximum depth of 0.6 metres.
- The long tail section provides shallow water play experiences with stepping stones and jets squirting water.
Facilities next to the lagoon include a cafe, BBQs, lockers, showers and toilets.
The lagoon can be a very busy place especially on a hot sunny day. Parents with little kids might prefer to visit the Robelle Splash – a zero depth water play area in Robelle Domain which features a large tipping bucket.

From Victoria Point, it’s about 53km by car to Orion Lagoon with an approximate journey time of 48 to 58 minutes. Car parking is available near the lagoon, at the shopping centre, and on the southern side of Robelle Domain.
Springfield Central train station is about 600 metres from the Orion Lagoon. Trains to Springfield Central leave Roma Street Station every 30 minutes on weekends, traveling via Toowong, Indooroopilly, Corinda, and Darra.
Orion Lagoon is operated by Ipswich City Council with open hours from 5:00am to 9:00pm during warmer months from September to April. In the cooler months from May to August, open hours are from 7.00 am – 5.00 pm.
All sections of the lagoon are patrolled by lifeguards but signage reminds parents that lifeguards are not babysitters.
Ipswich City Council’s annual cost to operate Orion Lagoon is about $2 million (including $850,000 for lifeguards) according to a Courier Mail story published in July 2021.
Construction of Orion Lagoon took about 18 months, from March 2014 to September 2015. It cost $10.3 million to build, funded by Ipswich City Council and the Federal Government who contributed a $5 million grant.
If the construction cost is adjusted for inflation using the ABS CPI index, it would be equivalent to about $14 million in today’s dollars.
More than 400,000 people visited Orion Lagoon in its first year of operation, four times more than the number expected, according to a Courier Mail report dated 9 November 2016.
Vee Design (who designed the lagoon) and Ipswich City Council won a 2016 national Award of Excellence from Parks and Leisure Australia for their work on developing Orion Lagoon.


Free public swimming lagoons in Queensland
25 years since Airlie Beach got a free public swimming lagoon
Settlement Cove swimming lagoon in Redcliffe
Public swimming lagoons in Queensland – South Bank