212 units proposed for 22 Waterloo Street, Cleveland

22 Waterloo Street
Notification advertised in the Redland Bayside News July 10 – 16, 2025

Plans for 212 apartments at 22 Waterloo Street in Cleveland which exceed height limits prescribed in the Redland City Plan have been advertised with submissions due by 1 August 2025.

The proposed development is on the corner of Waterloo and Queen Streets in Cleveland and has a small frontage to Taylor Crescent. The Cleveland Train Station and Cleveland CBD shops are about 500 metres walking distance away from the site.

For the 212 unit development at 22 Waterloo Street, the developers propose to provide 305 car park spaces in two basement levels. Vehicle will enter and leave the two levels of basement car parks via Queen Street. The developers’ Traffic consultants note that the proposal is two car parks short of the planning scheme’s requirements for car parking.

The developers’ Planning Report says “the Proposal involves a 10 storey Multiple Dwelling with a maximum height of 30.8m (approx.) to roof and 31.4m (approx.) to top of lift overrun”. The Redland City Plan prescribes a maximum height of 19 metres for this location.

The developers note that the adjacent block (18-20 Waterloo Street) has an approval for eight storeys. The application for 18-20 Waterloo Street was first made in 2014 but the site is still undeveloped.

22 Waterloo Street has not (yet) been called in

An email exchange between the Council and the developers reveals that at this point in time the 22 Waterloo Street application has not been called in for development approval at a Council meeting which ensures that there is a high level of transparency and political accountability for any decision made. In the absence of a ‘call in’ the decision will be made by planning officers under delegation.

Any division councillor can “call in” a development application though it is customary for this to be done by the division councillor for the affected area. This proposed development is located in Division 2 and the local councillor is Peter Mitchell.

144 Middle Street was called in

Cr Peter Mitchell recently called in a development application for eight storeys at 144 Middle Street Cleveland. At its meeting on 19 March 2025 the Council decided to issue a preliminary approval for one less storey. The developer has appealed the Council’s decision in the Planning and Environment Court.

The development application for 22 Waterloo Street

The development application MCU25/0051 for 22 Waterloo Street can be viewed on the Redland City Council website. Shown below are some images contained in reports and other documents for 22 Waterloo Street which are publicly available.

Redlands2030 – 10 July 2025

3 thoughts on “212 units proposed for 22 Waterloo Street, Cleveland”

  1. Karen Houghton

    The fact that the Redlands Shire Council is even considering this insidious proposal, is further proof that our deplorable council, is completely devoid of a moral compass! Nothing matters to this council, other than making bucket loads of money. And it doesn’t give a damn as to how many rules, regulations and laws it ignores or breaks, to meet it’s agenda.
    They also have zero regard for the will of the people – THEIR ACTUAL EMPLOYERS!!!
    I have lived in Sydney, Canberra, Brisbane City Council jurisdictions, London and Copenhagen and the Redlands Shire Council is indisputably the WORST council I have lived within. An unmitigated disgrace!

  2. The fact that they have approved an 8 storey building on an adjacent site is proof, that this council has no regard for the rate payers and the approved council height limitations. Many buildings already break the code, but have been allowed to bend the rules. Going to a 10 storey level creates yet another precedent that will be challenged by developers with deep pockets. ONE REALLY IMPORTANT aspect of this development, and many many others in the council’s jurisdiction, is the growth of commuters coming from this area. The main roads into the city are already becoming choked by traffic, and yet another 212 units, and hazard a guess, at how many more cars are added to the daily grind that has become just that. Perhaps the council needs to add a traffic improvement levy onto developers that ensures the behemoths they create, contributes to traffic management. Peter Mitchell needs to leave a legacy for the job he has been given, and do what is right for the community that employs him.

  3. Traffic on Finucane Road, Capalaba, has steadily been increasing, normally around 2:00 p.m. Yesterday, Wednesday, mid-day, Finucane Road was like rush hour, congested, but moving well. With rate of growth in Redlands, we will soon be in gridlock. By 3:00 p.m. all four roads in Capalaba CBD at 4-way intersection are congested. There has to come a time when development is halted for infrastructure to catch up. Transport Department need to work with town planners to encourage drivers to leave car at home and use public transport. Too many motorists have already died on Finucane Rd between Alexandra Hills and 4-way intersection at Capalaba. Where is the Lord Mayor’s promised getting on and off Metro bus boarding at City Hall traveling along Old Cleveland Road to Capalaba? Redland City has poor public transport with commuters wedded to their motor vehicles. The ex-Commonwealth land in Birkdale off Old Cleveland road East, has already seen a young male struck by a utility near entry to the site, leaving him in hospital with two broken legs. Congestion will worsen and environment destroyed with proposed development of a Whitewater canoe-racing facility + other buildings to fill up the conservation land. This land, should, rightfully, be left to the people…young and old, to visit a peaceful, natural, stress free environment, to help mentally ill at one with Mother Nature.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top